Deliverables RequestedList or summarize all specific deliverables resulting from this project. What will the project produce or deliver? These should include items that are specific, measurable, achievable, realistic, and time bound.
(1) The Ellucian Banner API connector is installed and configured in the Banner SaaS test environment, with stable connectivity to the Parchment test environment.
(2) End-to-end transcript processing is tested successfully, including automated data exchange, credential output, and confirmation of delivery from Banner SaaS to Parchment.
(3) Any limitations or gaps between the current RoboRegistrar functionality and the new Parchment Banner API integration are clearly documented, with business process adjustments or workarounds identified and approved.
(4) Output formatting and delivery for all transcript types are reviewed and formally approved by functional leads.
(5) A Parchment-led UAT workshop is completed, followed by formal user acceptance testing by functional staff. UAT approval is obtained, confirming that the new integration meets functional and technical requirements.
(6) The solution is placed in a “ready for production” state, with final deployment tasks scheduled to align with the July 1, 2026 Banner SaaS go-live.
(7) Key stakeholders—including both IT and Admissions, and any other impacted functional areas—formally sign off on the integration, confirming that all success criteria have been met.